Ask three fencing companies how much a new fence costs and you will get three answers, all of them starting with "it depends". That is not evasion. A fence is priced by the job, not by the item, and two gardens with exactly the same length of boundary can be a straightforward morning’s work in one case and a long day with a breaker and a skip in the other.

What follows is a plain explanation of the things that actually move a fencing quote. Read it, look at your own boundary, and you will have a reasonable sense of whether your job sits at the simple end or the involved end before you ask for a quote.

Panel type sets the baseline

The panels are the most visible choice and usually the first thing people ask about, so it makes sense to start there.

Overlap and waney lap panels are the familiar budget option: thin horizontal slats fixed to a light frame. They are the cheapest way to close off a boundary and they look perfectly tidy when new. The trade-off is strength. Thin timber flexes in wind and the frames are slight, so in an exposed spot on a hillside they take a beating.

Closeboard fencing is a different build altogether. Vertical featheredge boards are fixed to horizontal rails, overlapping each other, usually with an arris rail construction behind. There is far more timber in it, it is heavier, and it stands up to wind much better. That extra material and the extra labour in building it put it above overlap on price. For most exposed gardens across East Lancashire and the Pennine edge, it is the sensible middle ground.

Slatted and contemporary panels sit higher again. Planed timber, consistent gaps, neat framing: the appeal is the look, and the cost reflects better-grade timber and tighter tolerances. Slatted fences with deliberate gaps also behave differently in wind, which can be an advantage on an exposed boundary, though they do not give full privacy.

Composite fencing is the highest material cost of the common options and it is worth being honest about why people choose it. The boards do not need staining, they do not warp the way timber can, and the finish stays even. You are paying up front to avoid the maintenance cycle later. Composite systems also tend to use their own posts and channels, so the whole system is priced together rather than panel by panel.

None of this makes the cheaper panel the wrong answer. A short, sheltered boundary between two houses does not need the same build as an exposed rear fence catching wind off open ground.

Posts and gravel boards: the part that decides how long it lasts

This is where quotes diverge most, and where the cheapest option is often the false economy.

Timber posts are set into the ground, usually in concrete. They keep costs down and they suit a traditional look, especially with closeboard. The weak point is always the same: the section at ground level, where the timber is alternately wet and dry. That is where rot starts, and when a timber post fails the whole section has to come apart to replace it.

Concrete posts cost more to buy and they are heavier to handle, which shows in the labour. What you get is a post that does not rot, with slots that hold the panels. If a panel is damaged, it lifts out and a new one drops in without touching the posts at all. For anyone thinking about the next storm rather than just this week, that changes the arithmetic.

Gravel boards are the strip that sits along the bottom of the fence, between the ground and the panel. Concrete gravel boards lift the timber clear of wet soil and leaf litter, which is exactly where panels usually begin to fail. They add material cost and a bit of setting-out time. They also let you deal with a sloping or uneven ground line neatly, and they can add usable height to the fence. Timber gravel boards are cheaper and are a sacrificial part: they are meant to be replaced before the panel is.

A quote using concrete posts and concrete gravel boards will be higher than one using timber throughout. It is not the same fence, and it is worth comparing like with like when you have two numbers in front of you.

Taking the old fence away

Removal and disposal is a genuine, separate part of the job and it varies enormously.

A fence that is still standing, with timber posts in soft ground, comes out relatively quickly. A fence with concrete footings around every post is a different proposition: each one has to be dug out or broken up, and the spoil has to go somewhere. Old concrete posts are heavy and awkward to lift.

Storm damage adds its own problems. Smashed panels, split rails and nail-studded timber are slow and careful work, and if the fence has come down across a flowerbed, a greenhouse or a path, there is clearing up before there is any fencing.

Then there is disposal. Old panels, posts and broken concrete all have to be loaded up and taken away, which takes time off site. If you have a way of using or disposing of the old materials yourself, say so when you ask for a quote, because it does come off the scope.

Length, access and what is under your feet

Three site factors can turn a simple fence into a complicated one.

Boundary length is the obvious one, but the relationship is not perfectly linear. Every job has setting-out time, loading and unloading, and travel. A very short run carries a bigger share of that fixed effort per panel, while a long straight run becomes more efficient as it goes. Corners, steps and returns each add work.

Access matters more than most people expect. Posts, panels, concrete posts and bags of postcrete all have to physically reach the boundary. If a van can park alongside and everything is carried a few steps, that is one thing. If materials have to go through a terraced house, round a long side path, up steps, or through a narrow gate, every single item is handled multiple times. On the terraced streets common across this part of Lancashire and over the Yorkshire border, access is often the single biggest difference between two otherwise identical quotes.

Ground conditions decide how hard the holes are to dig. Soft garden soil is straightforward. Heavy clay, old hardcore, buried rubble, tree roots or a previous owner’s concrete all slow things down. A boundary that runs along a slope needs stepped panels or raked construction, which takes more setting out. And services matter: anything buried near the line has to be found and worked around safely.

Height and permission

Height affects cost directly, because taller panels cost more and need deeper, better-braced posts. It can also affect what you are allowed to do. In England, the General Permitted Development Order on legislation.gov.uk sets the limits: a fence next to a highway used by vehicles can be up to 1 metre high without planning permission, and up to 2 metres elsewhere, with different rules for listed buildings. In a conservation area there can be extra checks too. The Planning Portal sets out the current position clearly and is the right place to check before committing to a height.

It is also worth sorting out who owns the boundary and having a word with whoever lives on the other side. Agreement before work starts is far easier than a conversation afterwards.

The extras that are easy to forget

Gates are priced separately and vary a lot: a simple side gate is not the same as a wide double gate with drop bolts and a heavier frame. Trellis toppers, post caps, decorative finishes and treatment or staining all add to the total. So does any ground preparation, such as removing a stubborn shrub line or clearing a boundary that has been left to grow over.

Why a free quote beats a generic figure

A price range copied off the internet tells you almost nothing about your garden. It does not know that your access is through the house, that there are three concrete footings in the way, or that the run steps down twice along its length. Every factor above, panel type, post type, gravel boards, removal, length, access and ground, interacts with the others, which is exactly why an average figure is the one number that fits nobody.

A free quote is simply someone weighing those things for your boundary, from your details and photos, and putting a figure to them. It should set out the panel and post specification, whether gravel boards are included, what happens to the old fence, and what the finished height will be. With that set out, you can compare two quotes meaningfully instead of comparing two totals, and you can see immediately whether the cheaper one is cheaper because it is a lighter build or because it leaves the old fence for you to deal with.

Pro Fencing is based in Colne and works across the towns within roughly 25 miles, taking in East Lancashire and the nearer parts of West Yorkshire, including fencing in Nelson. It is run by Connor Lee, who has over 10 years of hands-on experience in fencing and landscaping.

If you want an answer that applies to your boundary rather than an average of everyone else’s, measure the run, take a couple of photos from each end, note how a van would get to the garden, and ask for a free, no-obligation quote. If you would rather talk it through first, get in touch with Pro Fencing.

Know the parts

What you are paying for

Line drawing of a fence: panels, rails, posts and gravel boards Panel Post Rails Gravel board

Questions

Frequently asked questions

01

Why will nobody give me a fence price over the phone?

Because the same length of fence can be two very different jobs. Ground conditions, access, the state of the existing posts and what has to be taken away all change the labour involved. A few photos and rough measurements of the run turn a guess into a proper quote.

02

Are concrete posts more expensive than timber posts?

The posts themselves usually cost more, and concrete gravel boards add to that again. The trade-off is that panels sit clear of wet soil and can be lifted out and replaced without disturbing the posts, so the cost picture looks different over the life of the fence.

03

Does taking the old fence away cost extra?

It is a separate part of the job, yes. Old panels, rotten posts and especially concrete footings take time to dig out, and the waste has to be loaded and disposed of properly. Storm damage with broken, nail-filled timber takes longer again.

04

Do I need planning permission for a new fence?

Most replacement fences at a normal garden height do not, but there are national limits on height, and extra rules near a highway, on listed properties and in conservation areas. The Planning Portal sets out the current position and is worth checking before you settle on a height.

05

What should I have ready before asking for a quote?

An approximate length of the run, whether the existing fence is staying or going, what the ground is like (soil, hardcore, concrete, slope) and how a van can get to the boundary. Photos of each end of the run help a great deal.

Ready when you are

Get your free quote

Get in touch today to discuss your fencing or landscaping project and receive a free, no-obligation quote.